jasminejohnsonoz6fvg jasminejohnsonoz6fvg
  • 10-11-2017
  • Mathematics
contestada

A tile company produces 7,500 tiles in 6 days. How many tiles does the company produce in 25 days?


a. 1,800 b.6,250 c. 31,250 d.187,500

Respuesta :

texaschic101
texaschic101 texaschic101
  • 10-11-2017
there r 2 ways u can do this...

(1) find the unit rate...
     7500/6 = 1250 per day
     for 25 days.....1250 * 25 = 31250 tiles <==

or

(2) proportion..
     7500/6 = x / 25.....7500 tiles to 6 days = x tiles to 25 days
     cross multiply
     (6)(x) = (7500)(25)
     6x = 187500
     x = 187500/6
     x = 31250 <==

either way, u should get the same answer
Answer Link
lalaloua
lalaloua lalaloua
  • 10-11-2017
C.31,250
6/7,500=25/x
187,500=6x
x=31,250
Answer Link

Otras preguntas

Which point is located at (8, 6)? 1014 C B B
18. A man bought a house for #1,800,and received N360 as rent for ayear. What is the ratio of the annualrent to the purchase price?(a) 1:2(b) 1:4(c) 1:5(d) 2:1(
Fill in the best answer for each of the following: An ionic bond forms when atoms ______ electrons. Another name for an ionic compound is a _____. Instead of fo
y+6=2 Make sure all work is shown
4. How much mass is required to exert a force of 25 Newtons, accelerating at 5 m/s?
Equation- a(10x+6)=b+40x. What is the value of A and B
Hey ss Please help I have no idea what the answer is
1 I returned home mother was preparing lunch.a) afterb) whenc) befored) until​
A car starts from rest and is moving at 60.0 m/s after 7.50 s. What is the car's average acceleration? Help!!!
All of the following contain garlic EXCEPT chili powder. garam masala. adobo seasoning. Creole seasoning.