beyasheikh5 beyasheikh5
  • 06-06-2017
  • Mathematics
contestada

If 15 workers can pave 18 driveways in 24 days, how many days would it take 40 workers to pave 22 driveways?

Respuesta :

nicholas77222 nicholas77222
  • 06-06-2017
what options are there?


Answer Link

Otras preguntas

Use the Distributive Property to rewrite the the expression -6 (r-8)
Over time romantic loves tends to _________ in love marriages and ________ in arranged marriages.
Emilio Aguinaldo was a​
The new diplomacy that emerged in the fifteenth and sixteenth centuries relied upon Select one: a. occasional emissaries sent by princes as the need arose. b. t
A tariff:_________. a. makes domestic producers worse off. b. makes everyone better off. c. makes domestic consumers worse off. d. makes both domestic produ
empathy coorporation are invertible in the country like Nepal which is full form of diversity justify this statement​
Question 4(Multiple Choice Worth 1 points) (02.04 MC) Choose the equation that represents a line that passes through points (−1, 2) and (3, 1).
3. What is the area of this triangle?26 cm10cm24 cm​
The Supreme Court separated the "mandatory" element of the Federal Sentencing Guidelines for Organizations from their advisory role, holding that their mandator
The coordinates of a triangle are P(1, 4), Q(3, 6), and R(5, 2). The triangle is reflected over a line and its image coordinates are P'(–1, 4), Q'(–3, 6), and R