promxo19 promxo19
  • 15-02-2017
  • Mathematics
contestada

the company found that an experienced surveyor can survey a roadbed in 5 hours. An apprentice needs 8 hours to survey the same stretch of road. If the two work together, find how long it takes them to complete the job.

Respuesta :

MickeyMouseiLover
MickeyMouseiLover MickeyMouseiLover
  • 15-02-2017
40 hours is the answer
Answer Link

Otras preguntas

Why did America rely heavily on slaves during the colonial period?
how many occupied orbitals does a fluorine atom contain in the ground state?
A high-speed computer printer prints a page in 1/6 second. Using this printer, how long would it take to print 30 pages?
The Nile river flows into the Mediterranean Sea, what is the volume of the Nile River?:)
What is 0.4^-2 (0.4 to the power of -2)?
how many occupied orbitals does a fluorine atom contain in the ground state?
70 pennies decreased by 20% is
660 ft/min=_________ft/s 1 min = 60 sec
What is the median cost of 26$, 35$, and 50$
A high-speed computer printer prints a page in 1/6 second. Using this printer, how long would it take to print 30 pages?