A construction crew has just built a new road. It took them 8 weeks to build 10.24 kilometers of road. At what rate did they build the road?

Respuesta :

Aswanglol6
Aswanglol6 Aswanglol6
  • 15-09-2022

Answer:

Are you trying to figure out how long the road is?

10.24 km per week, times 4 weeks.

10.24 x 4 = 40.96

Step-by-step explanation:

Answer Link

Otras preguntas

What is the first step to solve this problem for x? 2x+6+1x=12
The sum of the first two terms of a geometric series is 10, and the sum of the first four terms is 30. Show that the common ratio r satisfies r^2 = 2.Question:
A point charge q is placed at the centre of a cube of side length L . The electric flux emerging from the cube is……A. q/e0B. zeroC. (6ql)2/e0D. q/6L²e0
To overcome the barrier to success implied by the goal above, what should Enrique do? A) Set more challenging goals B) Give up on the goal C) Seek guidance from
The zero of a function is also called the ____ Y-intercept X-intercept Ordinate Intercept
Application of knowledge: The AdChoices program is an industry-sponsored initiative to encourage Web sites to be more transparent about how they use personal in
Is it an addendum or an amendment when the seller agrees to new repairs?
what is the minimum seperation between two particles whose maximum velocity is half the maximum velocities of the antinodes
A teacher takes 3 children from her class to the zoo at a time as often as she can, but she does not take the same three children to the zoo more than once. She
In the remaining 38 states, seat belt laws are "secondary" laws meaning ?