jaxonburwick50 jaxonburwick50
  • 08-02-2022
  • Mathematics
contestada







How long will it take 4 workers to complete a task, given that it takes 10 days for 6 workers to complete the same task?

Respuesta :

lovecamdenn83
lovecamdenn83 lovecamdenn83
  • 08-02-2022

Answer:

12 i think

Step-by-step explanation:

Answer Link
irisraya1
irisraya1 irisraya1
  • 08-02-2022

Answer: it will take 8 days for 4 workers

Answer Link

Otras preguntas

To find quotient, we use
A rectangular prism has a length of 20 in., a width of 2 in., and a height of 3 1/4 in. The prism is filled with cubes that have edge lengths of 1/4 in. How m
What is the best way to paraphrase this line? Students frequently overuse direct quotation in taking notes, and as a result they overuse quotations in the final
If AB,BC, and AC are 7 inches, 9 inches, and 10 inches, respectively, and XY is 9 inches, find XZ
Need help I don’t get it
i haven't got the pictures but ill hope somebody has the answer! Which shows line segments that appear to be perpendicular to each other?
5÷505 and i need working out aha ​
break the shapes into rectangles and triangles. then find the area
What is the volume of a sphere with diameter 5.5 m, to the nearest cubic meter? a. 87m^3 b. 90m^3 c. 95m^3 d. 101m^3
Use the drop-down menus to identify the moods of the verbs in this passage.Mrs. Lopez walked into the room. “Please pass____ forward your homework,” she said.