aileenabc aileenabc
  • 06-01-2022
  • Mathematics
contestada

if 6 workers complete a certain task in 5 days, how many workers are needed to finish the same task in 3 days?

Respuesta :

Anastaciamlong Anastaciamlong
  • 06-01-2022

Answer:

i think its 2 workers, ill delete this if its wrong:/

Step-by-step explanation:

Answer Link

Otras preguntas

Please help!! A Ferris Wheel at a local carnival has a diameter of 150 ft. and contains 25 cars. Find the approximate arc length of the arc between each car.
Give three pros and cons of getting a pug, and the same for a poodle.
is urbanization density dependent or density independent
Line m is tangent to the circle. Find the indicated measure
3RD ATTEMPT!!! REAL ANSWERS ONLY!!! Draw u + v + w.
Type the correct answer in the box. If cos x = sin(20 + x)° and 0° < x < 90°, the value of x is
Question 1 of 10 How has Victor changed by the end of Frankenstein? A. He has given up his humanity, since he still wants revenge, even once he's dead. B. He ha
2. At a particular snack stand, each dill pickle has 65 calories and each bag of popcorn has 250 calories. My friends and I bought a total of 5 pickles and bags
Why does drug abuse increase the risk of contracting HIV?
When Prince Hyacinth congratulates himself on not being blind to his own faults, he is demonstrating the literary device known as