8 man takes 15 days to cut a drain. How many men should be employed to complete the
work?​

Respuesta :

llbedoya
llbedoya llbedoya
  • 09-06-2021

Answer: 8 x 15 = 120

Answer Link

Otras preguntas

What value of k solves the equation? k-4=1/256
The US exports 200 billion pounds of coal. How many tons does the US export?
What is simplest form for 72/75
draw an obtuse right triangle
In a survey music preferences , 81 out of 450 students said that they preferred country music. What percent of the students preferred country music.
a square has 9 inch sides. every side of a pentagon is also 9 inches long. are their perimeters the same? explain
What Is the perfect square of 9x-1
Which step should be completed first to solve the equation --2 = 3z + 4 ? A. Add 2 to both sides. B. Subtract 4 from both sides. C. Divide both sides by 3.
What did the Framers want to achieve by establishing the principle of federalism in the Constitution? distribution of state and national powers expansion of t
How can you choose values for x when making a table of values representing a real world situation?