If the actual level of activity is 4% less than planned, then the fixed costs in the static budget should be decreased by 4% before comparing them to actual costs.

a. True
b. False

Respuesta :

ochukoorakpoghenor
ochukoorakpoghenor ochukoorakpoghenor
  • 11-03-2020

Answer: false

Explanation:

Answer Link

Otras preguntas

Which element is most likely to be featured in a work of realistic fiction? A. Endings that always provide closure B. Settings that are based in the future C.
Why was Great Britain the first nation to fully industrialize?
Which sentence best conveys the somber mood at the Cratchits' in "Stave IV: The Last of the Spirits"? A. "He broke down all at once." B. "Bob was very ch
How can I write an essay about Discovering Hero in Myself
Which element is most likely to be featured in a work of realistic fiction? A. Endings that always provide closure B. Settings that are based in the future C.
What does an industrial hygienist do?
The Commonwealth and the Industrial Revolution helped to create a strong
Is 5°C warmer the 5°F
which of these processes is responsible for generating the most ATP within cellular respiration
Solve −2(2x + 5) − 3 = −3(x − 1).