For an activity in a CPM analysis, the Early Start time is 8 and the Late Start time is 10. Activity duration is 4 days. Which of the following statements is true?
A) The Late Finish is 14
B) The Early Finish is 12
C) Delaying this activity by 2 days will not affect project duration
D) A and B E) A, B, and C

Respuesta :

Otras preguntas

A car slows down uniformly from a speed of 28 m/s to rest in 8.00 s. how far did it travel in that time?
Given m∠P = 38° and m∠O = 70°, find m∠1.38  72  108  142
what did farmers grow in the southern colonies?
Can u solve this for me
What is the most important step in prioritizing goals?
mac traveled to three cities on one highway. the total distance one way was 320 miles.
Which number line best shows the position of square root of 13?
What feature is located at a? a. rocky mountains b. appalachian mountains c. andes mountains d. ural mountains?
A ball is dropped from a height of 10 meters how long was the ball in the air and what is the speed when it hits the ground
Calculate the number of grams of sulfuric acid in 1 gallon of battery acid if the solution has a density of 1.31 g/ml and is 37.4 % sulfuric acid by mass.