You are considering a vendor to help with a project. You are confident about how much work and time is needed, but you want the vendor to accept the risk. Which type of contract would you likely use?
1) Fixed Price Contract
2) Time and Materials Contract
3) Cost Plus Contract
4) Unit Price Contract

Respuesta :

Otras preguntas

You may have met him-- did you not? how do the dashes affect the reading of this poem?
A plane traveled 2135 miles with the wind in 3.5 hours and 1855 miles against the wind in the same amount of time. Find the speed of the plane in still air and
what is the formula for formalin
who was the 5th president
how to revise in just 1 whole day for chemistry combined science is it possible to get a good grade
Ocean exploration lab report Cartesian diver
i need someone who knows HTML to finish the code.
7 boys mean height is 63 inches. If byron is 72 inches, how tall are the others combined
Compare the type of bonds in metalloids to metal (delocalized) and nonmetal (localized).
Nick handed in 2 paper to his professor, each paper is worth 5.5%. How much will both paper increase his grade?