kelseyvirgilio16 kelseyvirgilio16
  • 07-06-2023
  • Mathematics
contestada

A contractor better job at $750 for materials plus $43 per hour for labor. The total cost for the job can be modeled by C= 43H+ 750$.
Find the number of hours that he has for the job if the owner would like the total cost to be under $2000, rounded to the nearest hour.

Respuesta :

Otras preguntas

One of the Patriots' greatest strengths was their
Write each repeating decimal as a fraction in simplest form: 1. 0.21 repeating
Dscribe the feelings of the narrator when he consulted medical dictionary in the british museum
C= 1/2h(q+z) for q solve for q
Two step equations with integers What is r/10+4=5. Please explain!
What are the gases that come to equilibrium between the upper layer of the ocean and the atmosphere?
can u help me with this problem 1/2+-2/5t-1=1/5t+t
if 1 gallon of paint covers 400 sq feet, about how many gallons of paint are needed to paint the outside of a spherical tank of diameter 20 feet?
The active sections that are located along fault lines are called
According to the nebular hypothesis, how did most of the excess dust and gas in the solar system get removed?