daiquananderson9084 daiquananderson9084
  • 06-12-2022
  • Business
contestada

a manufacturer planned to use $82.00 of materials per unit produced, but in the most recent period it actually used $80.00 of material per unit produced. during this same period, the company planned to produce 1,200 units, but actually produced only 1,000 units. the flexible-budget variance for materials is:

Respuesta :

Otras preguntas

find out volume of the solid obtained by rotating the region bounded by the given curves about the specified line. y=lnx, y=1, y=3,x=0; about the y-axis.
Name the physical quantity measured by the area under velocity time graph?
Name the physical quantity measured by the velocity-time graph?
find out volume of the solid obtained by rotating the region bounded by the given curves about the specified line. y=lnx, y=1, y=3,x=0; about the y-axis.
what is abdominal cavity?
Match the function with its value f(x)= x2-3x+3 g(x)= 2x2-1 f(z^2)= .....
how many grams of NH3 can be prepared from 85.5 grams of N2 and 17.3 grams of H2 ?
If a grocery cart with a mass of 16.5 kg accelerates at +2.31 m/s2 against a frictional force of -15.0 N, what is the applied force?
What is meant by anterior and posterior region in our body?
what is the resistance of an ideal ammeter voltmeter ?